Availability: | |
---|---|
Quantity: | |
GFF
Product Description
Product Series | Gym Floor Series |
Product name | Right angle rubber mat |
Size | 500*500mm, 600*600mm, 1m*1m |
Material | Surface layer; full-color EPDM rubber particles Bottom layer; black SBR rubber particles |
Advantages | Anti-pressure, anti-slip, wear-resistant, sound-absorb and shock resistant , easy to install and maintain, environmental-friendly, recyclable |
Application | Gym, Ice rinks, home use, shooting range, etc |
Certificates | CE, EN71, REACH, ISO10140 etc |
Paving method and construction precautions
1. Construction notes:
(1). The construction site should try to avoid simultaneous with other construction projects.
(2). The ground to be laid should meet the following requirements.
A. Solid: The ground to be laid should be leveled cement ground or solid ground such as ceramic tiles, marble, terrazzo, etc. It cannot be sand, soil, or soft ground.
B The ground to be laid should be flat and smooth, without obvious grooves or pits.
C. Cleanness: The ground to be laid should be clean and free of floating soil, slag stains, and other debris.
D Dry: The ground to be laid must not have water or dampness.
2. Paving method:
(1). Before laying the floor, it should adapt to the ambient temperature (consistent with the temperature of the base floor). During laying and natural drying of the adhesive, large changes in temperature (such as direct sunlight) should be avoided.
(2). (Optional) Spread the glue evenly on the base floor and the back of the floor. When the glue is dry, align and paste it piece by piece, and tap it firmly with a rubber hammer. If any adhesive contaminates the floor surface, remove it immediately.
3. If the edges and corners of the laid floor are not aligned, hollow bulges, edges, or uplifts, need to be corrected or relaid, and they must be done before the adhesive is dry.
Product Description
Product Series | Gym Floor Series |
Product name | Right angle rubber mat |
Size | 500*500mm, 600*600mm, 1m*1m |
Material | Surface layer; full-color EPDM rubber particles Bottom layer; black SBR rubber particles |
Advantages | Anti-pressure, anti-slip, wear-resistant, sound-absorb and shock resistant , easy to install and maintain, environmental-friendly, recyclable |
Application | Gym, Ice rinks, home use, shooting range, etc |
Certificates | CE, EN71, REACH, ISO10140 etc |
Paving method and construction precautions
1. Construction notes:
(1). The construction site should try to avoid simultaneous with other construction projects.
(2). The ground to be laid should meet the following requirements.
A. Solid: The ground to be laid should be leveled cement ground or solid ground such as ceramic tiles, marble, terrazzo, etc. It cannot be sand, soil, or soft ground.
B The ground to be laid should be flat and smooth, without obvious grooves or pits.
C. Cleanness: The ground to be laid should be clean and free of floating soil, slag stains, and other debris.
D Dry: The ground to be laid must not have water or dampness.
2. Paving method:
(1). Before laying the floor, it should adapt to the ambient temperature (consistent with the temperature of the base floor). During laying and natural drying of the adhesive, large changes in temperature (such as direct sunlight) should be avoided.
(2). (Optional) Spread the glue evenly on the base floor and the back of the floor. When the glue is dry, align and paste it piece by piece, and tap it firmly with a rubber hammer. If any adhesive contaminates the floor surface, remove it immediately.
3. If the edges and corners of the laid floor are not aligned, hollow bulges, edges, or uplifts, need to be corrected or relaid, and they must be done before the adhesive is dry.